This code is prepared by China Railway Tunnel Group Co.,Ltd.in cooperation with other involved organizations according to the requirements of Document JIANBIAO [2008]No.105 issued by the Ministry of Housing and Urban-Rural Development(MOHURD)of the People'sRepublicof China-"Notice onPrintingand Distributing'the Development and Revision Plan of National Engineering Construction Standards in 2008(2nd Batch)'".
In preparing this code,the development team completed the draft of this code to be submitted for approval based on wide and extensive investigations and studies, experiences from practices,suggestions of professionals,and advanced international codes and advanced foreign standards and finally submitted it to Ministry of Housing and Urban-Rural Development for review and approval.
This code consists of 20 chapters and 2 appendixes,covering:general provisions,terms,basic requirements,construction preparations,construction survey,geological prediction,open channels,open tunnels and tunnel portal sections,excavation,muck loading,unloading and transportation,supporting,water curtain system,shaft construction,grouting,Ventilation,dust control,compressed-air supply,water supply and power supply,drainage,shaft equipment and pipeline installation,paving and plugging,monitoring and measurement,safety,environment and health,project delivery and acceptance.
The provisions printed in bold type are mandatory ones and must be implemented strictly.
The Ministry of Housing and Urban-Rural Development is responsible for the administration of this code and the interpretation of the mandatory provisions.China Petrochemical Corporation(Sinopec Group)is responsible for its routine management,and China Railway Tunnel Group is in charge of explanation of technical specification.During implementation of this code,any comments and advices can be posted or passed on to China Railway Tunnel Group Co.Ltd.(Address:3 East Lingyuan Road,Luoyang,Henan,P.R.China,Postcode:471009).
Chief Development Organization,Co-Development Organizations,Chief Drafters and Chief Reviewer of this code:
Chief Development Organization:
China Railway Tunnel Group Co.,Ltd.
Co-Development Organizations:
Sinopec Luoyang Petrochemical Engineering Co.,Ltd.
Sinopec Shanghai Engineering Co.,Ltd.
COOEC-ENPAL Engineering Co.,Ltd.
China Machinery Engineering&Construction Corporation
China Petroleum Engineering&Construction Corporation East China Branch
Beijing New Oriental Star Petrochemical Engineering Co.,Ltd.
Zhongnan Engineering Corporation Limited of China Hydropower Engineering
Consulting Group
Huangdao National Oil Reserve Base Co.,Ltd.
China Anneng Construction Corporation
Chief Drafters:
HONG Kairong GAO Cuncheng JI Zhuanping GUO Defu
ZHENG Hongzhong GUAN Zeying CHEN Haifeng ZHANG Weiping
ZHOU Yang ZHANG Li HE Fengyou YANG Sen HU Dexin
ZHANG Quncheng HE Guofu ZHANG Chaojin LIANG Jianyi XU Jia
ZHAO Xiao MIAO Guoqing HAN Xintao
Chief Reviewers:
ZHOU Fengjun ZHOU Jiaxiang ZHU Yongquan GE Chunyu
ZHUANG Guopei HUANG Zuojian WANG Ningyang LUO Xianqi
REN Yi YANG Xiaohong MA Zhenming ZHANG Lianzhong ZHAO Fuyun
LIU Dewen