购买
下载掌阅APP,畅读海量书库
立即打开
畅读海量书库
扫码下载掌阅APP

Foreword

According to the requirements specified in the Plan for Revising the Second Batch of Professional Standards in 2011(Document Number:[2011]No.134)issued by the Ministry of Industry and Information of the People's Republic of China,this Specification is developed by its development team based on wide and intensive investigations and studies made,practices and experience summarized and with references to international codes and advanced foreign standards.

This Specification comprises 9 chapters and 11 appendixes.

The main technical contents of this Specification includes the basic requirements for layout of longdistance oil/gas pipeline stations,site selection and regional layout,general layout,vertical layout,pipe coordination,landscaping and environmental protection,etc.

China Petrochemical Corporation(Sinopec Group)is in charge of the administration of this Specification,Sinopec Technical Center for General Plot Plan Design is in charge of its routine management,and China Petroleum Pipeline Engineering Co.,Ltd is in charge of explanation of specific technical contents.If any comments and recommendations are proposed in implementation of this Specification,please send your comments/recommendations to the routine management organization and chief development organization.

Routine management organization:

Sinopec Technical Center for General Plot Plan Design

Address:No.27,West Zhongzhou Road,Luoyang City,Henan Province

Postcode:471003

Tel:0379-64887144

Fax:0379-64887301

Chief Development Organization:

China Petroleum Pipeline Engineering Co.,Ltd.

Address:No.146,Heping Road,Langfang City,Hebei Province

Postcode:065000

Participating Development Organizations:

East China Pipeline Design and Research Institute

Shengli Engineering & Consulting Co.,Ltd

Luoyang Petrochemical Engineering Corporation/Sinopec

Chief Drafting Staff:

Lu Yong Guo Baoshen Bian Rongxia Zhang Jianguo Wan Jun

Li Xiangyong Li Yayun Li Jin Yi Shiyou Dong Xu

Zhang Wenwei Zhao Rui Jian Zhaoming Ye Hongyue

Chen Feng Yu Liangjun Hu Baisong Liu Zhongqing Gong Yunfeng

Chief Reviewing Staff:

Zhang Sheng Chen Ji Yu Jian Wang Zhiyong Jiang Minghuo

Zhou Yun Yan Chaofan Hang Xiulian Ji Baisen Zhang Zhongming

Liang Yan Zhang Ping Dongye Changyu

This Specification is initially issued. 4IGz4pvOKA+04i4EVvhByJykc4IXrUdghW6Lq7Z0kUnsZYDcKnOpsphtIRPZz9WJ

点击中间区域
呼出菜单
上一章
目录
下一章
×