购买
下载掌阅APP,畅读海量书库
立即打开
畅读海量书库
扫码下载掌阅APP

6.1 General Requirements

6.1.1 The main facilities within the water-sealed cavern storage should be laid out in different areas according to Table 6.1.1.

Table 6.1.1 Function division of Water-sealed Cavern Storage and Main Facilities in Different Areas

Note:The shaft operation area shall be classified into the underground production area if it is located in the operation tunnel.

6.1.2 The surface facilities of the water-sealed cavern storage should be located over the underground production area.

6.1.3 On the premise of complying with the functional and fire protection requirements,the surface buildings or structures that are similar in properties should be merged. hyRlZPq9nTpKNhLx/J4U1PjzFcrvEyrgXxgAd047gGzJNsNTS1uYi4/Ad7aOfXOv

点击中间区域
呼出菜单
上一章
目录
下一章
×