购买
下载掌阅APP,畅读海量书库
立即打开
畅读海量书库
扫码下载掌阅APP

4.1 General Requirements

4.1.1 Design of control room buildings shall comply with occupational health,safety and environmental protection requirements.And control room buildings for petrochemical process plants with potential explosion hazards shall be designed in compliance with SH/T 3160.

4.1.2 Control room buildings shall be designed and constructed according to the capacities,features,management requirements and operation modes of the petrochemical plants. R6znKguoOwKWwz5ymgqnvJdpCiG1n2nEMa0FQ3vblWSKm0Cbv4ZApHQlynFj0NJz

点击中间区域
呼出菜单
上一章
目录
下一章
×