购买
下载掌阅APP,畅读海量书库
立即打开
畅读海量书库
扫码下载掌阅APP

Foreword

According to the requirements specified in the Plan for Revising Professional Standards in 2009(GongXinTingKe[2009]No.104)issued by the Ministry of Industry and Information Technology of the People's Republic of China,this Specification is developed by the development team based on extensive investigations and studies made,practices summarized,comments requested as well as references to international and advanced foreign standards.

This Specification comprises 7 chapters and 8 appendices.

Main technical contents in this Specification include the constitution and management requirements of the construction technical documentation,the content,development,implementation and management requirements of the construction execution plan,the categorization,contents,implementation and management requirements of the construction method statement,and the development,implementation and management requirements of the construction operation instruction.

China Petrochemical Corporation(Sinopec Group)is in charge of the administration of this Specification,Sinopec Technical Center for Construction is responsible for its routine management,and Sinopec the Fourth Construction Company Limited is tasked for the explanation of specific technical contents.If any comments and recommendations are proposed in the implementation of this Specification,please address them to the routine management organization and chief development organization.

Routine Management Organization:

Sinopec Technical Center for Construction

Address:No.180 Shiji Road,Binhai New Area(Dagang),Tianjin

Postcode:300270

Tel:022-6386 3843

Fax:022-63862301

Chief Development Organization:

Sinopec the Fourth Construction Company Limited

Address:No.180 Shiji Road,Binhai New Area(Dagang),Tianjin

Postcode:300270

Participating Development Organizations:

Sinopec Tenth Construction Company Limited

Beijing Yanhua Construction Engineering Co.,Ltd.

Sinopec Ningbo Engineering Company Limited

Wison Engineering Ltd.

Chief Drafting Staff:

Di Changyou Wu Zhongxian Sun Xiuhuan Qiu Junyue Zhang Guihong

Li Jiang Liu Xiaoping Li Guanghong

Chief Reviewing Staff:

Guo Jian Ge Chunyu Wang Xinyan Zhang Jun Pan Yueming

Wei Chenyu Shu Zhijun Wang Yonghong Niu Xian Zhao Yuehua

Liang Canxi

This is the first issue of this Specification. WDqFH/LyfNDSzCgBZjqtID29w6Nl6i2DzLEvbdI1nbOCaEDZbHthFItf0wzc55Uz

点击中间区域
呼出菜单
上一章
目录
下一章
×