购买
下载掌阅APP,畅读海量书库
立即打开
畅读海量书库
扫码下载掌阅APP

2.1 General Layout

2.1.1 In addition to meeting the requirements of process flow,the general layout shall be with reasonable use of topography,clear division and compact arrangement.

2.1.2 The clinker production line should be set nearby the limestone mine.The cement grinding line shall be close to the product market and the source of additive material,and shall be located outside the blasting security line. zjuoSTLyaHB+lpTTMR44zImjqVnAqwLg1nojbMXPNZsyk4mmwcdR4pjNONX0YIwy

点击中间区域
呼出菜单
上一章
目录
下一章
×